Services
Everything between the drawing and the site.
Six processes in one 4,200 m² works, each with a published starting price and lead time. Most jobs combine three or four, and you get one quote for all of them.
Laser cutting
A 6 kW fibre laser on a 3,000 × 1,500 mm bed. Mild steel to 25 mm, stainless to 20 mm, aluminium to 16 mm, cut to ±0.1 mm straight from your DXF.
From £45 per order of simple parts
5 working days
Press-brake bending
A 160-tonne CNC press brake with a six-axis back gauge. Folds up to 3.2 m in one hit, first-off parts measured before the batch runs.
From £1.20 per bend, plus £35 set-up
7–10 working days
Welding and fabrication
MIG, TIG and MMA in five bays, by welders coded to BS EN ISO 9606-1. Frames, brackets, chassis, tanks and one-off repairs at a £58 an hour shop rate.
From £58 per hour shop rate, £145 minimum
10–15 working days
Structural steelwork
Beams, columns, bracing and baseplates fabricated to BS EN 1090-2 at EXC2, CE marked, blasted and primed, and erected by our own squad.
From £1,650 per tonne, fabricated and primed
15 working days
Stairs, balustrade and access
Escape stairs, feature stairs, handrail, balustrade and access platforms, designed to Part K, fabricated in-house and fitted by our own squad.
From £2,400 per straight flight, fitted
15 working days
Powder coating
Blast to SA2½, then powder coat in any RAL colour in our own booth and 7-metre oven. Fine texture, gloss, satin and zinc-rich primer systems.
From £18 per m², £65 minimum per colour
3–5 working days
Certified work
CE marked, traceable, signed off
Structural steel leaves with a CE mark and a declaration of performance. Every welder is coded for the work they do.
- BS EN 1090-1 Execution class EXC2
- BS EN ISO 9606-1 Coded welders, re-tested every 2 years
- BS EN ISO 3834-3 Fusion welding quality
- ISO 9001 Quality management
- CHAS Health and safety, assessed yearly
- Constructionline Gold Pre-qualified supplier